No | Device Name | Test Reference | Category | Duration (office day) | QA Cost | VT Cost | TA Cost |
---|---|---|---|---|---|---|---|
121 | Tiang Telepon Beton Pratekan Penampang Bulat 8 Meter Tipe 124-150 | STEL L-023-2001 Versi 2.0 | Lab. Kabel | 15 | 16,000,000 | 16,000,000 | 0 |
122 | Tiang Telepon Beton Pratekan Penampang Bulat 8 Meter Tipe 157-200 | STEL L-023-2001 Versi 2.0 | Lab. Kabel | 15 | 17,000,000 | 17,000,000 | 0 |
123 | Tiang Telepon Beton Pratekan Penampang Bulat 8 Meter Tipe 157-300 | STEL L-023-2001 Versi 2.0 | Lab. Kabel | 15 | 18,000,000 | 18,000,000 | 0 |
124 | Tiang Telepon Beton Pratekan Penampang Bulat 8 Meter Tipe 190-350 | STEL L-023-2001 Versi 2.0 | Lab. Kabel | 15 | 19,000,000 | 19,000,000 | 0 |
125 | Tiang Telepon Beton Pratekan Penampang Bulat 8 Meter Tipe 190-500 | STEL L-023-2001 Versi 2.0 | Lab. Kabel | 15 | 20,000,000 | 20,000,000 | 0 |
126 | Tiang Telepon Beton Pratekan Penampang Bulat 9 Meter Tipe 124-100 | STEL L-024-2001 Versi 2.0 | Lab. Kabel | 15 | 15,000,000 | 15,000,000 | 0 |
127 | Tiang Telepon Beton Pratekan Penampang Bulat 9 Meter Tipe 124-150 | STEL L-024-2001 Versi 2.0 | Lab. Kabel | 15 | 16,000,000 | 16,000,000 | 0 |
128 | Tiang Telepon Beton Pratekan Penampang Bulat 9 Meter Tipe 157-200 | STEL L-024-2001 Versi 2.0 | Lab. Kabel | 15 | 17,000,000 | 17,000,000 | 0 |
129 | Tiang Telepon Beton Pratekan Penampang Bulat 9 Meter Tipe 157-300 | STEL L-024-2001 Versi 2.0 | Lab. Kabel | 15 | 18,000,000 | 18,000,000 | 0 |
130 | Tiang Telepon Beton Pratekan Penampang Bulat 9 Meter Tipe 190-350 | STEL L-024-2001 Versi 2.0 | Lab. Kabel | 15 | 19,000,000 | 19,000,000 | 0 |